Most projects are decided early and judged late.

We work at both ends of a capital project. Before the money is committed, we test the plan. After the contract is signed, we run the record and, when it comes to it, recover what the contract owes.

WHO WE ARE · SENIOR-LED PRACTICE

A contracts practice on your side of the table.

We act for contractors, for employers, and as independent expert. We have done all three.

“We know how the other side will read your record, because we have written their rejection.”

On the capital side, our Director has also sat owner-side on a US$24bn mining and infrastructure programme and run a multi-asset development portfolio.

For Contractors

Building, serving and realising extension of time, prolongation, and quantum claims. Rebuilding the daily site records into a chain of evidence a tribunal can check, day by day.

Realising what the contract provides

For Employers

Testing entitlement, condition-precedent verification, and defending unmerited contractor claims. Back-charge validation, liquidated damages enforcement, and counter-claim substantiation.

Defending against unsubstantiated exposure

As Independent Expert

Jointly appointed to determine delay and quantum entitlement on agreed terms of reference. Objective forensic analysis conforming to the SCL Delay and Disruption Protocol.

Impartial determination on the merits & records

We look for the risk before it reaches the budget.

THE PATTERN · EMPIRICAL REFERENCE-CLASS DATA

Overrun is the industry norm. Recovery is not.

Major capital assets systematically overrun budget and schedule. We benchmark against published reference-class data to measure true tail-risk before FID—and enforce the record when claims arise.

Cost Overrun Risk Across Energy & Infrastructure Classes

Reference dataset of 16,000+ projects · Flyvbjerg, Budzier & Christodoulou

Nuclear storageHIGHEST IN CLASSsmall sample (N=25)— Covers nuclear waste storage
+233%
Nuclear power
+120%
Hydroelectric dams
+75%
IT
+73%
Rail stationssmall sample (N=71)
+43%
Rail
+39%
Tunnelssmall sample (N=69)
+36%
Oil and gas
+31%
Mining
+27%
Bridgessmall sample (N=61)
+26%
Water
+20%
Fossil thermal power
+18%
Roads
+15%
Pipelines
+14%
Wind powersmall sample (N=84)
+12%
Electricity transmissionsmall sample (N=50)
+8%
Solar powersmall sample (N=41)
+1%
View accessible data table
ClassNAverage Cost Overrun %% of Projects Overrunning >50%
Nuclear storagesmall sample(Covers nuclear waste storage)
25+233%52.00%
Nuclear power
196+120%54.59%
Hydroelectric dams
300+75%37.33%
IT
5360+73%18.26%
Rail stationssmall sample
71+43%23.94%
Rail
372+39%27.15%
Tunnelssmall sample
69+36%27.54%
Oil and gas
116+31%19.83%
Mining
886+27%16.93%
Bridgessmall sample
61+26%21.31%
Water
265+20%13.21%
Fossil thermal power
136+18%15.44%
Roads
2086+15%9.97%
Pipelines
437+14%9.61%
Wind powersmall sample
84+12%7.14%
Electricity transmissionsmall sample
50+8%4.00%
Solar powersmall sample
41+1%2.44%
Source: Flyvbjerg, B., Budzier, A. and Christodoulou, M., "Towards a Theory of Modular Natives: Explaining Superscaling, China's Greatest Innovation Yet", arXiv:2606.15757, Draft 4.2, Table 1. Real terms, measured from final investment decision. Cost analysis N = 11,011 projects, from a database of 16,000+ projects across 23 project types. Accessed 24 Nov 2026.
Explore the 17 classes shown
Footnote: A working paper. Check the final published version before relying on exact values.

WHERE RECOVERY FAILS

The three places claims are lost.

The difference is not the argument. It is the file. When contractors fail to realise entitlement or employers overpay unmerited prolongation, the failure traces to three specific points:

The Record

Notice served out of time. Condition precedent missed. Incomplete contemporaneous daily site logs. A claim does not fail on the merits; it fails at the gate.

Sub-Clause 20.1 / 20.2 discipline

The Schedule

Delay claimed on activities off the true critical path. Native logic ties broken. Baseline updates unapproved or containing hidden retrospective constraints.

Forensic P6 Critical Path analysis

The Sequence

Concurrency ignored. Prolongation claimed while the claimant was itself delayed in procurement or engineering submittals. The chain of cause and effect disintegrates.

Six links of cause and effect

HOW WE WORK · FOUR PRINCIPLES

Senior attention. Clear loyalty.

We are a senior-led practice. No layers of billable juniors, no conflicting corporate ties, and nothing submitted until you have agreed it.

01 / ALIGNMENT

Aligned to you.

Privately owned and arm’s-length. We do not carry conflicting corporate alliances with your counterparty, its parent group, or its major subcontractors. When we take a mandate, our loyalty on the file is singular.

02 / TEAM STRUCTURE

Lean core team.

The principals named on the proposal are the people reading your correspondence, testing your P6 native schedules, and drafting the position papers. No layered pyramids, no junior handoffs.

03 / COMMERCIAL DISCIPLINE

Fixed monthly fee.

Predictable, transparent commercial arrangements tied to explicit deliverables and milestones. Where a success fee is agreed, it sits cleanly on top of the fixed commitment, never in place of it.

04 / STRATEGY DISCIPLINE

Strategy before service.

Nothing is submitted to your counterparty, engineer, or tribunal until the strategy is stress-tested, the exposure evaluated, and you have concurred with the approach.

THE TWO DOORS

Where is the project?

Choose your entry point. Two practices, one standard of evidence. There is no third door.

Project InceptionAward: The Demarcation PointCommercial Close-Out
FEED
FID
AWARD
CONSTRUCTION
COMMISSIONING
CLOSE-OUT
Capital Projects: FEED to AWARD
PMS: AWARD to CLOSE-OUT & Independent Expert
DOOR 1 · DEVELOPMENT ADVISORY

Capital Projects

Before the money is committed.

“Test the plan, map the constraints, decide with the evidence in front of you.”

Independent, senior-led development advisory before final investment decision. Reference-class benchmarking, safeguard contingency regimes, and modular industrial delivery screening.

Exclusively Inside This Door

Nuclear Post · Capital-Projects Journal

Disciplined delivery research. Every figure traced to primary sources. No claims vocabulary.

DOOR 2 · CONTRACTS & CLAIMS

Project Management Services

Once the contract is signed.

“Run it. Record it. Recover it.”

Active contract management, contemporaneous project controls, forensic delay analysis, and dispute resolution. Acting for contractors, employers, and as independent expert.

Exclusively Inside This Door

Contract Musings · Contracts & Claims Register

Formal case situations, condition-precedent rules, and procedural gate defence.