Most projects are decided early and judged late.
We work at both ends of a capital project. Before the money is committed, we test the plan. After the contract is signed, we run the record and, when it comes to it, recover what the contract owes.
WHO WE ARE · SENIOR-LED PRACTICE
A contracts practice on your side of the table.
We act for contractors, for employers, and as independent expert. We have done all three.
“We know how the other side will read your record, because we have written their rejection.”
On the capital side, our Director has also sat owner-side on a US$24bn mining and infrastructure programme and run a multi-asset development portfolio.
For Contractors
Building, serving and realising extension of time, prolongation, and quantum claims. Rebuilding the daily site records into a chain of evidence a tribunal can check, day by day.
For Employers
Testing entitlement, condition-precedent verification, and defending unmerited contractor claims. Back-charge validation, liquidated damages enforcement, and counter-claim substantiation.
As Independent Expert
Jointly appointed to determine delay and quantum entitlement on agreed terms of reference. Objective forensic analysis conforming to the SCL Delay and Disruption Protocol.
We look for the risk before it reaches the budget.
THE PATTERN · EMPIRICAL REFERENCE-CLASS DATA
Overrun is the industry norm.
Recovery is not.
Major capital assets systematically overrun budget and schedule. We benchmark against published reference-class data to measure true tail-risk before FID—and enforce the record when claims arise.
Cost Overrun Risk Across Energy & Infrastructure Classes
Reference dataset of 16,000+ projects · Flyvbjerg, Budzier & Christodoulou
View accessible data table
| Class | N | Average Cost Overrun % | % of Projects Overrunning >50% |
|---|---|---|---|
Nuclear storagesmall sample(Covers nuclear waste storage) | 25 | +233% | 52.00% |
Nuclear power | 196 | +120% | 54.59% |
Hydroelectric dams | 300 | +75% | 37.33% |
IT | 5360 | +73% | 18.26% |
Rail stationssmall sample | 71 | +43% | 23.94% |
Rail | 372 | +39% | 27.15% |
Tunnelssmall sample | 69 | +36% | 27.54% |
Oil and gas | 116 | +31% | 19.83% |
Mining | 886 | +27% | 16.93% |
Bridgessmall sample | 61 | +26% | 21.31% |
Water | 265 | +20% | 13.21% |
Fossil thermal power | 136 | +18% | 15.44% |
Roads | 2086 | +15% | 9.97% |
Pipelines | 437 | +14% | 9.61% |
Wind powersmall sample | 84 | +12% | 7.14% |
Electricity transmissionsmall sample | 50 | +8% | 4.00% |
Solar powersmall sample | 41 | +1% | 2.44% |
WHERE RECOVERY FAILS
The three places claims are lost.
The difference is not the argument. It is the file. When contractors fail to realise entitlement or employers overpay unmerited prolongation, the failure traces to three specific points:
The Record
Notice served out of time. Condition precedent missed. Incomplete contemporaneous daily site logs. A claim does not fail on the merits; it fails at the gate.
Sub-Clause 20.1 / 20.2 discipline
The Schedule
Delay claimed on activities off the true critical path. Native logic ties broken. Baseline updates unapproved or containing hidden retrospective constraints.
Forensic P6 Critical Path analysis
The Sequence
Concurrency ignored. Prolongation claimed while the claimant was itself delayed in procurement or engineering submittals. The chain of cause and effect disintegrates.
Six links of cause and effect
HOW WE WORK · FOUR PRINCIPLES
Senior attention.
Clear loyalty.
We are a senior-led practice. No layers of billable juniors, no conflicting corporate ties, and nothing submitted until you have agreed it.
Aligned to you.
Privately owned and arm’s-length. We do not carry conflicting corporate alliances with your counterparty, its parent group, or its major subcontractors. When we take a mandate, our loyalty on the file is singular.
Lean core team.
The principals named on the proposal are the people reading your correspondence, testing your P6 native schedules, and drafting the position papers. No layered pyramids, no junior handoffs.
Fixed monthly fee.
Predictable, transparent commercial arrangements tied to explicit deliverables and milestones. Where a success fee is agreed, it sits cleanly on top of the fixed commitment, never in place of it.
Strategy before service.
Nothing is submitted to your counterparty, engineer, or tribunal until the strategy is stress-tested, the exposure evaluated, and you have concurred with the approach.
THE TWO DOORS
Where is the project?
Choose your entry point. Two practices, one standard of evidence. There is no third door.
Capital Projects
“Test the plan, map the constraints, decide with the evidence in front of you.”
Independent, senior-led development advisory before final investment decision. Reference-class benchmarking, safeguard contingency regimes, and modular industrial delivery screening.
Nuclear Post · Capital-Projects Journal
Disciplined delivery research. Every figure traced to primary sources. No claims vocabulary.
Project Management Services
“Run it. Record it. Recover it.”
Active contract management, contemporaneous project controls, forensic delay analysis, and dispute resolution. Acting for contractors, employers, and as independent expert.
Contract Musings · Contracts & Claims Register
Formal case situations, condition-precedent rules, and procedural gate defence.